Calculating skim matrices during an assignment
1. Make sure your settings for the individual skim matrices are correct (Setting metadata for skim matrices).
2. Make sure your settings for the PuT skim matrices are correct (Setting parameters for PuT skim matrices).
3. Specify a procedure sequence including a PuT assignment (Selecting and executing a PuT assignment procedure).
4. Make sure that option Calculate skim matrices has been checked in the Basis tab of the assignment parameters.
Note: The settings in the Basis tab, in the Zone selection and Assignment time period sections are relevant for skim matrix calculation (Timetable-based assignment: Basis page). |
5. After selecting multiple demand segments, make sure that in the Demand segments tab, the assignment parameters set are correct (Timetable-based assignment: Demand segments page).
6. In the Skim matrices tab, make the desired settings (Settings for PuT skim matrix calculation).
7. Click the Execute button.
During the procedure sequence, the skim matrices are calculated according to the specified order simultaneously with the assignment.
Note: You can then open and edit the skim matrices (Editing matrix values). |